GIDC develops special infrastructure like water augmentation and distribution infrastructure, culverts, over bridges, training centres, warehouses, etc. GIDC also upgrades existing infrastructure facilities in the established industrial estates periodically. Through the proposed project GIDC intends to upgrade necessary infrastructural facilities in Saykha Industrial Area which includes a Common Effluent Treatment Plant (CETP) for different industrial waste/effluent.
Read More
There are 3 CETPs in the same region, in Jhagadia, Ankleshwar and Panoli with the total capacity of around 63 MLD. However these CETPs are addressing the current effluent generation in the region.
Additionally considering the rapid industrial growth in Dahej region augmenting treatment capacity GPCPSIR is inevitable.
GIDC has estimated an effluent inflow of 40 MLD based on the sectors planned in Saykha Industrial Estate.
Area (in hectareS) : 543.5 Estimated Effluent generation (in MLD) : 4.91
Area (in hectareS) : 427.3 Estimated Effluent generation (in MLD) : 15.38
Area (in hectareS) : 212.3 Estimated Effluent generation (in MLD) : 11.68
Area (in hectareS) : 148.3 Estimated Effluent generation (in MLD) : 4.89
Area
(in hectareS)
Estimated Effluent generation (in MLD)
Taking a Lead from our Past Presidents,who have done a Commendable Job in Establishing and Revitalizing the Spirit of an Association,the new team is making the association more strong,responsive,sensitive and prompt-to come forward and address the needs of the industry.