► Adani Port (Dahej) - 11.7 MMTPA
► GCPTCL Liquid Chemical Terminal - 1.8 MMTPA
► LNG Petronet (Gas Terminal) - 12.5 MMTPA
► Reliance liquid fuel jetty - 2.12 MMTPA
► Birla Copper bulk cargo jetty - 3.8 MMTPA
► Ro-Ro Ferry Service Terminal by GMB (construction work started)
► Development of jetty for handling ODC (Over Dimensional cargo) in Joint Venture with Dahej SEZ Ltd.
► Development of Marine Shipbuilding Park (MSP) at Dahej
► 41 MMTPA ports by Sandesara Group (Solid Cargo, Liquid Cargo and Container Port)
► One 220 KV sub-stations located at Dahej & Vilayat
► Seven 66 KV substations located at Dahej, Luna, Bhensali & Vilayat
► Gujarat Energy Transmission Corporation Limited (GETCO) has completed construction of 220 KV substation at Suva Dahej, which is in operation.
► 1600 MW gas based power plant by Torrent Power Ltd. in Dahej SEZ. The first phase of 400 MW is operational.
► Construction of 2640 MW coal based power plant of Adani Power is in progress.
► Two 220 KV & Eight 66 KV substations are planned in Dahej & Saykha
► GIDC supplies 25 MGD raw water drawn from Narmada river at Nand and Angareshwar each.
► Water supply scheme for 50 MGD water from Miyagam Branch Canal (130 km) and 25 MGD water from Narmada River (65 km).
► Currently 90 MLD disposal pipeline of 40 km is laid within PCPIR to dispose the effluent into deep sea (4.5 Km inside the sea).
► Setting up of a CETP with capacity of 40 MLD by GIDC in Dahej. (Work in progress).
► 90 MLD disposal pipeline and 40 MLD CETP at Saykha
► Gujarat Gas Company Limited (GGCL) currently owns and operates nearly 900 km of distribution pipelines in Bharuch district.
► The company needs to directly apply for gas to GSPL